Service

Life Is Our Business

Production Verification Test

The PVT phase is aimed at solving problems stemming from incomplete design verification, the aim being to achieve a balance between quality consistency and costs.

We deliver flexible manufacturing services that are responsive to the changes in your business.

We are able to control yield rate and costs based on our experience in medical device manufacturing.

Central to this is DFM where right from the design stage we target enhancing the yield rate and controlling costs.

 

 The process consists of FDA/TUV audits.

Then there is the pilot production transfer following which we confirm the production process.

We then confirm the quality standard and the production efficiency.

 

ACHB's QC inspector is checking high-precision components with Mitutoyo 3D CMM.
ACHB's QC inspector is checking high-precision components.

Interested in ACHB?