The EVT phase involves testing a number of product samples to test for their compliance with the relevant standards such as the FDA or PMDA.

This process enables us to learn more about a product’s required and potential performance as well as the manufacturing process and the production steps likely to be included.

 

We first map out the test plan in detail, select the team, and confirm the SOW. We then decide on the design, develop the team and decide upon the detailed specifications followed by identifying the key components and suppliers.

 

Our engineers will then review all the test data and verify the outcome of the test. We verify the target cost and the overall plan viability.

 